Lesson 25 · 3:08

Cost Approach

Finish the cost approach: cost source, replacement cost of the home, effective age and remaining life, depreciation, delivery and installation, and the indicated value.

Watch this lesson in DataMasterSign in to your DataMaster account to watchCost Approach — UAD 3.6 Manufactured Home Report

Transcript

Cost Approach

With the site value in place, we finish the Cost Approach: what it would cost to replace the home today, less depreciation, plus the site improvements and the land. Start near the bottom of the section, with where the cost figures come from: General Description.

Cost data and methods

Cost Type: Replacement, the cost of a home with the same utility, built with today's materials and methods. Reproduction would be an exact replica. Cost Data Source: we used a cost service, so choose Cost Service. Then pick the provider, Marshall & Swift, and the quality rating we priced the home at: Good. Effective Date: for a cost service, the date its data was last updated. Ours is November 9, 2026. Cost Method: Comparative Unit, one cost per square foot for the whole home. Depreciation Method: Economic Age-Life.

Cost new

Now the cost of the dwelling. Select Add Area Type, and choose Above Grade Finished Area, the home's finished living area. Area Size is the home's finished area, 1,782 square feet, at $105 per square foot. DataMaster multiplies it out: $187,110.

Age and life

Below the table, the home's Effective Age: 10 years, given its wear and its updates. Remaining Economic Life: 55 years. Explain both in the commentary. Remaining economic life commentary is required when it's under 30 years, and it's good practice either way.

Less depreciation

With the economic age-life method, depreciation is effective age over total economic life: 10 years out of 65, about 15 percent. Physical Depreciation: 15 percent, or $28,067. We found no functional or external problems, so both are 0 percent. A manufactured home adds one more line: Manufactured Home Delivery, Installation, and Setup, from the invoice when there is one. Here, $95,000. The dwelling's total, including depreciation and setup, is $254,043.

Everything but the home and land

As Is Value of Site Improvements covers what the site adds beyond the land itself: the well, the septic system, the driveway, electric service and landscaping. They can share one row, at $125,000.

Adding it up

At the top, the Indicated Value by Cost Approach adds it all up: $254,043 for the dwelling, $125,000 for the site improvements, and $350,000 for the site. That's $729,043. Cost Approach Commentary is required. Ours explains why this approach gets no weight in the reconciliation: depreciation is hard to estimate, and material costs are volatile.

Reconciliation

That completes the Cost Approach. Next, Reconciliation.