Lesson 15 · 1:19

Overall Quality and Condition

Rate the manufactured home as a whole from its exterior and interior ratings, mind the C1 rule for older manufactured homes, and reconcile the ratings in commentary.

Watch this lesson in DataMasterSign in to your DataMaster account to watchOverall Quality and Condition — UAD 3.6 Manufactured Home Report

Transcript

Overall Quality and Condition

Overall Quality and Condition rates the property as a whole, drawing on the ratings we've already given. Open it from the section list.

Exterior and interior ratings

The exterior ratings carry over from Dwelling Exterior, and the interior ratings from Unit Interior. Inside and out, this home is Q3 and C3.

Q3 and C3

Overall Quality rates all the dwellings on the property together. With Q3 inside and out, choose Q3. Overall Condition reflects the condition as if any required repairs were done. For a manufactured home built more than twelve months before the effective date, it can't be C1. This 1998 home is well kept and partly updated: C3.

Explain the ratings

Reconciliation of Overall Quality and Condition is required. Explain how the ratings come together. Ours describes the home's quality and floor plan, notes that no inadequacies were observed, and lists the updates the owner reported, from this year's flooring back to the vinyl windows. It ends by confirming that the utilities and heating were working at the inspection.

Inspection Photos

That's Overall Quality and Condition. Next, we'll place the inspection photos in the report.